RoadsPlanned
Maintenance at the Cruz Tunnel (VE1)
Vehicle control system maintenance takes place during the night of 24 September between km 8+450 and 9+125 of the VE1 in the Machico to São Jorge direction. The works involve a one-lane restriction and associated traffic disruption.