← All incidents
RoadsPlanned

Maintenance at the Cruz Tunnel (VE1)

Vehicle control system maintenance takes place during the night of 4 August between km 8+470 and 9+125 of the VE1 in the Machico > São Jorge direction. The works involve the closure of one lane and resulting traffic disruption.