← All incidents
RoadsPlanned

Pipeline repair on the VE1

Water pipeline repair works are taking place between kilometres 10+950 and 11+050 of the VE1 in the direction of São Jorge to Machico. The work occurs during the night-time on 3 and 4 August, resulting in a lane closure and traffic disruption.